On 2 March 2006, we imposed a fine of £250,000 on Network Rail for its failure to ensure the information it made available to the industry on the capability of its infrastructure was accurate. Infrastructure Capability - letter to NR regarding completion of final milestones in the recovery plan PDF icon PDF, 103 Kb 10 Jan 2008 Infrastructure Capability - Breach of Network Licence - Letter from

Overruns documentation

14 January 2014
Body
On 13 May 2008, we imposed a penalty of £14m on Network Rail because of systemic weaknesses in Network Rail's planning and execution of engineering work which represented a serious and continuing breach of its licence. These problems were exposed in our investigation into the overruns into the New Year. Improving project delivery - 2010 Audits - ORR letter to Network Rail 15 Jul 2010 Improving

Periodic review 2008

14 January 2014
Body
The 2008 Periodic Review (PR08) set the outputs that Network Rail must deliver, and the level of access charges paid by train operators for use of the infrastructure from 1 April 2009 to 31 March 2014, or control period 4 (CP4).

Our decisions for 2014-2019

14 January 2014
Body
The decisions we've made will help the railway to grow in a sustainable way which minimises the costs to taxpayers, passengers and freight customers.

PR13 efficiency benchmarking of Network Rail

14 January 2014
Body
The assessment of the scope for Network Rail to improve on its cost efficiency is central to our work, since it enables us to establish efficient levels of track access charges when we periodically review Network Rail's outputs as part of a balanced package.