Rail

System operation in control period 6 (CP6)

21 September 2017
Body
This page provides details of our work and publications on developing the framework for Network Rail’s national system operator (NSO) in control period 6 (CP6) as part of the 2018 periodic review (PR18).

Consultation on ORR's approach to track access and the future operation of High Speed 2 (HS2)

11 September 2017
Body
Conclusions On 9 April 2018, we published our conclusions to our September 2017 consultation and we also updated the original consultation letter so that it is now a regulatory statement. September 2017 consultation Date published: 21 September 2017 Closing date: 20 October 2017 The purpose of this consultation was to seek views on how ORR proposed to take into account the future operation of HS2