Periodic review 2018 (PR18) initial consultation and conclusions
10 August 2016
Body
In May 2016, we published our first major consultation on the 2018 periodic review (PR18). PR18 would determine Network Rail Infrastructure Limited’s (Network Rail’s) outputs and funding in control period 6 (CP6, which will run from 1 April 2019 to 31 March 2024). P