Components
  • A and L function: refers to functions within ORR Access and Licensing Team. These are passenger track access, freight access and stations and depot access
  • Access regulatory information: the report name for the information we publish relating to passenger, freight and station and depot access on regulated networks
  • AVG days: the average amount of days across all applications
  • Awaiting formal submission: an application that is in the pipeline but not yet submitted to ORR
  • Complexity RAG: a red, amber, green status applied to cases based on how complex they are for ORR to undertake its duties
  • Consultation: the industry consultation carried out by Network Rail on behalf of the application
  • Facility name: the station, depot etc that the contract refers to
  • FNPO: Freight and National Passenger Operator. This is an area of Network Rail that looks after nationwide operators
  • Formal submission invited: ORR has completed its review and instructed applicants to submit the finalised legal documents
  • Formal submission received: the applicants have submitted the finalised legal documents for ORR to approve
  • General approval: permits Network Rail and a train operator to make amendments to their track access agreement, subject to certain conditions, without our specific approval
  • IM: infrastructure manager
  • Influencing factors: considerations ORR undertakes during application review
  • Informal submission received: ORR has received an application from an infrastructure manager and a beneficiary to amend their contract
  • Live cases: the current access applications being reviewed by ORR
  • NC milestone: relates to timetable production dates published in NR’s network code
  • Non Network Rail Infrastructure: areas of railway infrastructure that are not managed by Network Rail
  • Operator: train operator
  • RFT: right first time
  • PCD: principal change date
  • Region/route: geographical area of Network Rail
  • SCD: subsidiary or summer timetable change date
  • Section: section of the Railways Act
  • Segment: the market segment of passenger train operators, whether they are open access operators or on public service contracts
  • SoAR: Network Rail’s sale of access rights panel
  • Specific approval: a regulated access contract reviewed and approved by ORR
  • TAC: track access contract
  • Total access rights: the overall number of track access rights held by passenger train operators
  • Total services planned: the number of services with access rights that train operators plan to run on the network
  • Total services ran: the number of services with access rights that train operators actually ran on the network
  • Under review: means ORR is undertaking its review of the application in line with its statutory duties